Geodata
Tunnel & Tunnelling
KIDE application I-CPT/Borehole location optimisation: Optimising CPT and borehole locations to maximise information gain while minimising site investigation costs.
KIDE application II-Soil Testing Optimisation: Identifying the most informative soil samples and laboratory tests to maximise model accuracy while minimising testing effort.
